BONJOCH FREGINALS , Mireia (2015) Analyse et optimisation de la gestion des déchets conventionnels des sites nucléaires en déconstruction. PFE - Projet de fin d'études, ENSTA.
Fichier(s) associé(s) à ce document :
| PDF 4Mb |
Résumé
Waste is generated by multiple producers who have the responsability of its management. Waste is a threat to humans and the environment. Waste must be submitted to a specific and rigorous management which is necessary to plan and control. The objective of this project is to verify the comformity of waste management of EDF nuclear plants under deconstruction between 2010 and 2014, and to suggest solutions for improvement. For this, the nine first-generation reactors will be analyzed: Brennilis, Bugey 1, Chinon A1, A2, A3, Chooz A, Creys-Malville and Saint-Laurent A1 and A2. In this study, different points will be analyzed such as the principle of proximity and the territorial plans, the respect of the hierarchy of waste treatment, the comformity of waste treatment plants and the correct traceability of removed waste. The results show that the waste management is well done and in accordance with the law and internal requirements of EDF. Improvements have nevertheless been detected for each site, especially regarding the choice of waste treatment plants and traceability. The analysis procedure can not be systematized due to the evolutibity of the consulted documents. However, it could be used to verify waste confomity of any producing site.
Type de document: | Rapport ou mémoire (PFE - Projet de fin d'études) |
---|---|
Mots-clés libres: | Déchet conventionnel – Code de l’Environnement – Centrale nucléaire en déconstruction - Principe de proximité – Traitement déchets - Traçabilité |
Sujets: | Mécanique des fluides et énergétique |
Code ID : | 6684 |
Déposé par : | UTILISATEUR INCORRECT |
Déposé le : | 08 juin 2016 15:26 |
Dernière modification: | 08 juin 2016 15:26 |