PETITCOLIN, M. Corentin (2025) SAP Procurement Automation: A Closed-Loop PR to PO Engine and More PFE - Project Graduation, ENSTA.

Full text not available from this repository.

Abstract

This project delivers a SAP-centric automation of the PR to PO (Purchase Requisition to Purchase Order) workflow focused on Stock (Z1) replenishment and a Calibration MVP. The solution uses an Excel (VBA) front end with SAP GUI scripting to keep the user experience familiar while implementing a closed loop – verify -> create -> log -> release – with idempotence and hash-based validation to prevent silent overrides. Architecture and rules are aligned with SAP master data (materials, vendors, info records, DOA/OA) and preserve manual control for releases and exceptions. The evaluation compares three weeks before vs. three weeks after go-live on the same plants/purchaser group. Results show improved service and stability: (1) Stock fulfillment rises from 96.75% to 97.5%, (2) PR to PO lead time (Z1) improves from 2.8 to 2.2 days, and (3) quality metrics tighten (PO rework 2.5% -> 0.3%, exceptions 1.5% -> 0.3%). Over a five-week observation of 921 POs and 2,014 PR lines, a conservative floor estimate indicates ~14.3 hours of manual effort avoided, excluding additional batching and navigation gains. The project demonstrates a pragmatic path to measurable value without shadow systems and outlines a roadmap toward data-feedback consolidation and S/4HANA readiness

Item Type:Thesis (PFE - Project Graduation)
Uncontrolled Keywords:SAP EPR, PR to PO automation, Excel VBA, Calibration
Subjects:Information and Communication Sciences and Technologies
ID Code:10863
Deposited By:Corentin PETITCOLIN
Deposited On:20 oct. 2025 16:44
Dernière modification:20 oct. 2025 16:44

Repository Staff Only: item control page