Mbeutcha, Monsieur Yves (2014) Conception et développement d'un modèle d'optimisation pour la production électrique court terme. PFE - Project Graduation, ENSTA.
![]()
| PDF 1069Kb |
Abstract
Short-term hydroelectric planning aims at providing a production schedule for hydro units in order to match the electric demand, mostly on an hour basis. This document presents the Mixed Integer Linear Programming (M.I.L.P.) based model we developed for the short-term hydroelectric generation at Hydro-Québec. This mathematical model is deterministic, while water inflows and electric demand are extracted from forecasts before the planning process. Even if the selected modelisation destroys many symmetries, integer solutions are difficult to find. Therefore, heuristics based on the root relaxation solution have been developed to help the exploration process.
Item Type: | Thesis (PFE - Project Graduation) |
---|---|
Uncontrolled Keywords: | Short-term hydroelectric planning, M.I.L.P, deterministic, root relaxation |
Subjects: | Mathematics and Applications |
ID Code: | 6552 |
Deposited By: | INVALID USER |
Deposited On: | 24 mars 2015 12:44 |
Dernière modification: | 24 mars 2015 12:44 |
Repository Staff Only: item control page